TechWhirl (TECHWR-L) is a resource for technical writing and technical communications professionals of all experience levels and in all industries to share their experiences and acquire information.
For two decades, technical communicators have turned to TechWhirl to ask and answer questions about the always-changing world of technical communications, such as tools, skills, career paths, methodologies, and emerging industries. The TechWhirl Archives and magazine, created for, by and about technical writers, offer a wealth of knowledge to everyone with an interest in any aspect of technical communications.
1 Month X 0 = 0 Months
1 Month X 1 (100%) = 1 Month
1 Month X 2 (200%) = 2 Months
1 Month X 3 (300%) = 3 Months
1 Month X 4 = 4 Months = 400% = 16 weeks = 8 paychecks, minus taxes, 401K,
and whatever I overspent in the cafeteria because I'm too lazy to pack a lunch.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Kyle Kimberlin
Technical Writer
Digital Instruments, Veeco Metrology Group
Santa Barbara, CA. USA
kyle -at- di -dot- com
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
> > > 4 months is 400% longer than 4 weeks...4 times
> > > longer.
> >
> > Actually, John, 4 months is 300% longer than 4
> > weeks, 3 times longer, or 4 times as long.
> >
> > Assuming 1 month equals 4 weeks:
> > * One month is 0% longer than 4 weeks (1 time as long).
> > * Two months is 100% longer than 4 weeks (2 times as long).
> > * Three months is 200% longer than 4 weeks (3 times as long).
> > * Four months is 300% longer than 4 weeks (4 times as long).
>